Update wrapper, add obstructed version

- pins are now a bit wider and extend slightly outside the core area
- added an obstructed version of the wrapper to be used for routing to
  gurantee that none of the resources within the user area is taken
  while top-level-routing
- the core ring is completely outside the project area as marked by the
  boundary in the various views (TODO: resolve FastRoute issue with
  non-zero origins)
85 files changed
tree: d102ed881e476f5ded60bab9501fa34d97bd898f
  1. .travisCI/
  2. def/
  3. doc/
  4. gds/
  5. lef/
  6. macros/
  7. mag/
  8. ngspice/
  9. openlane/
  10. qflow/
  11. scripts/
  12. spi/
  13. verilog/
  14. .travis.yml
  15. info.yaml
  16. LICENSE
  17. Makefile
  18. README.md
README.md

CIIC Harness

A template SoC for Google SKY130 free shuttles. It is still WIP. The current SoC architecture is given below.

Getting Started:

Start by cloning the repo and uncompressing the files.

git clone https://github.com/efabless/caravel.git
cd caravel
make uncompress

Then, you can learn more about the caravel chip by watching these video:

Managment SoC

The managment SoC runs firmware that can be used to:

  • Configure Mega Project I/O pads
  • Observe and control Mega Project signals (through on-chip logic analyzer probes)
  • Control the Mega Project power supply

The memory map of the management SoC can be found here

Mega Project Area

This is the user space. It has limited silicon area (TBD, about 3.1mm x 3.8mm) as well as a fixed number of I/O pads (37) and power pads (10). See the Caravel premliminary datasheet for details. The repository contains a sample mega project that contains a binary 32-bit up counter.

The firmware running on the Management Area SoC, configures the I/O pads used by the counter and uses the logic probes to observe/control the counter. Three firmware examples are provided:

  1. Configure the Mega Project I/O pads as o/p. Observe the counter value in the testbench: IO_Ports Test.
  2. Configure the Mega Project I/O pads as o/p. Use the Chip LA to load the counter and observe the o/p till it reaches 500: LA_Test1.
  3. Configure the Mega Project I/O pads as o/p. Use the Chip LA to control the clock source and reset signals and observe the counter value for five clock cylcles: LA_Test2.