6.0 ESSENTIAL TAPEOUT CHECKLIST | |
================================= | |
6.1 All layout databases given to GLOBALFOUNDRIES should be in layout cell hierarchical based GDSII | |
data. | |
6.2 All drawn and designer-generated GDS layers must be provided to GLOBALFOUNDRIES by the | |
designers for successful DRC, DR waiver and tapeout. | |
6.3 Before design data can be submitted for tapeout, the design must pass DRC. | |