| 6.0 Essential Tapeout Checklist |
| =============================== |
| |
| 1. All layout databases given to GlobalFoundries should be in layout cell hierarchical based GDSII data. |
| |
| 2. All drawn and designer-generated GDS layers must be provided to GlobalFoundries by the designers for successful DRC, DR waiver and tapeout. |
| |
| 3. Before design data can be submitted for tapeout, the design must pass DRC. |
| |
| 4. Algorithms to remove small field enclosures in GLOBALFOUNDRIES -generated implant layers TN, TP, HVN, and HVP are available in our DRC runset YI-093-CC003. |