6.0 Essential Tapeout Checklist | |
=============================== | |
1. All layout databases given to GlobalFoundries should be in layout cell hierarchical based GDSII data. | |
2. All drawn and designer-generated GDS layers must be provided to GlobalFoundries by the designers for successful DRC, DR waiver and tapeout. | |
3. Before design data can be submitted for tapeout, the design must pass DRC. | |