| 6.0 Essential Tapeout Checklist | |
| =============================== | |
| 1. All layout databases given to GlobalFoundries should be in layout cell hierarchical based GDSII data. | |
| 2. All drawn and designer-generated GDS layers must be provided to GlobalFoundries by the designers for successful DRC, DR waiver and tapeout. | |
| 3. Before design data can be submitted for tapeout, the design must pass DRC. | |